Tamilnadu Electricity Board v. M/S.bridge Tunnel Construction Co.

Supreme Court of India · 18 February 1997 · [1997] 2 S.C.R. 132

Court
Supreme Court of India
Decided
18 February 1997
Case no.
C.A. No. 1766-1767 of 1997
Reported as
[1997] 2 S.C.R. 132
Result
Appeal(s) allowed
Bench
K. Ramaswamy, S. Saghir Ahmad
Length
17 pages
Have a question about this judgment?

Ask our Legal AI about it on WhatsApp: free, no signup, in English or Hindi.

Write it first.

PETITIONER:
TAMILNADU ELECTRICITY BOARD
Vs.
RESPONDENT:
M/S. BRIDGE TUNNEL CONSTRUCTIONS & ORS.
DATE OF JUDGMENT: 18/02/1997
BENCH:
K. RAMASWAMY, S. SAGHIR AHMAD

ACT

HEADNOTE

JUDGMENT

ORDER

Leave granted. Substitution allowed.

These appeals, by special leave, arise from the judgment of the Madras High Court, dated December 20, 1990, made i n O.S.A. Nos. 109 and 110 of 1988.

The admitted facts are that the respondents had entered into an agreement with the appellant to construct interconnecting tunnels for Suruliyar Hydroelectric Project as per specification No. 1138- Schedule-B to the agreement. The initial value of the tender to be awarded was Rs. 47 lakhs and it was revised to Rs. 69 lakhs on January 16, 1975. In the course of execution of the contract, a sum of Rs.92 lakhs was paid to the respondent. The contract was to be completed within a period of 24 months from the date of taking over of the site, i.e., January 18, 1975; thus, it was completed after the expiry of the term, on August 25, 1978. Resultantly, there had arisen a dispute as to the entitlement to further amount towards the work done by the respondent.

On a notice issued by the respondent for appointment of an arbitrator in terms of clause 50 of the contract (arbitrator clause), there was a delay on the part of the appellant i n nomination of the arbitrator. When the respondent exercised the power, after expiry of the time prescribed in the notice, appointing a sole arbitrator, proceedings under Section 33 of the Arbitrator Act, 1940 were initiated by the appellant. One of the objections raised by the appellant in the proceedings under Section 33 was that under the terms of the contract the claim sought to be put up in the notice given by the respondent was not arbitrable. The question was gone into and the court recorded a finding as under:

"If the petitioner had come forward

to raise dispute and if it is

outside the scope of clause 50, the

first respondent itself would come

forward with such a reservation. It

is not as if all disputes would

come within the cope of clause 50

and only those that would come

within the ambit of clause 50 alone

can be decided by the Arbitrators

when such is the clear position on

this aspect; enabling the

petitioner Board to raise a

objection regarding disputes which

may not come within the scope of

clause 50 is not a concession, but

a recognition of a right, which is

available not only to the

petitioner Board but also the first

respondent in the event of the

Board raising any dispute as

against it. Therefore, the first

stipulation is dependent upon the

Arbitrators deciding as to whether

particular dispute would come

within the scope of Section 50 or

not, and only if they consider that

it falls within the scope of

Arbitration clause, they would have

the jurisdiction to decide the

same. In the event of the

Arbitrators holding that any

particular dispute is outside the

Arbitration clause, it is not as if

the first respondent is deprived of

remedies by agitating the same in

Course."

It is also further held that :

"After the award is made, as the

petitioner Board has already

reserved its right, it would enable

the Board to raise this point, in

the event of any need arising for

setting aside the award in Court."

Pursuant thereto, condoning the delay liberty was given to the appellant to nominate an Arbitrator on its behalf which accordingly was done and dispute was referred to arbitration. Arbitrability of some of the claims was disputed as part of no liability. Since the two Arbitrators differed, an umpire was selected by the Arbitrators and he had gone into the question. At this stage, it is relevant to mention that some of the claims made by the respondents relate to excavation of hard rock in the tunnel and the rate of claims.

The relevant clauses of the Contract postulate thus :

"22. Material to be excavated :

The character of the material

through which the tunnel is to be

excavated is indicated i n the

report of the Geologist of the

Geological Survey of India,

attached of this specification as

an appendix. The probable nature of

materials to be excavated is given

in the above report. It is

expressly to be under stood,

however, that the purchaser does

not guarantee the accuracy of the

information and should the

conditions be found to differ from

those indicated, the contractor

shall have no claim against the

purchaser on the grounds of

misrepresentation. Moreover, the

price to be given in the schedule

of prices for excavation work is to

be inclusive and to be held to

cover excavation in the actual

materials encountered.

23. Tunnel Excavation:

a) The tunnel is to be excavated

to such dimensions as to give the

minimum thickness of concrete

lining specified and to suit the

shape and size of cross section of

the tunnel shown on drawing.

b) Excavation is to be carried

out as far as feasible,

simultaneously on all fages. It is

expected, that more of the ground

alone the tunnel will be hard rock

requiring the supports. Except

where the materials penetrated is

hard rock and will safely stand by

itself, the tunnel is to be lined

temporarily with timber supports

and shoring. The timbering is to be

kept as alose to the face of the

heading as possible. Any shoring of

protective arrangements considered

inadequate by the Engineer is to be

strengthened immediately.

g) The type of tunnel section to

be constructed shall be as directed

or approved by the Engineer.

Measurement for payment of tunnel

excavation, will be limited to the

special sectional dimensions and

will be made along the established

centre line of the tunnel and

payment therefore will be made at

the unit bid in the schedule for

excavation of all classes of

tunnel. No additional allowance

above the unit price bid in the

schedule for excavation of all

eclasses of tunnel will be made on

account of the class, nature or

condition of any of the material

encountered."

The rates were mentioned in the Schedule and the respondent had set up the claims raised at rates higher than the contracted rates and twice the rate for the work done after the expiry of the contract period.

Against the claims, objections were raised by the appellant. They have disputed the claim set up by the respondents and requested the Arbitrators to decide on the arbitrability of the items mentioned in the claims of the respondents. The umpire, without going into the details, in a non-speaking award as against the claim of Rs. 2 crores 10 lakhs, has awarded a consolidated sum of Rs. 70.83 lakhs as under :

"I hereby award and direct as

follows:

(1) The Respondent shall pay the

claimant a sum of Rupees Seventy

Lakhs eighty three thousand seven

hundred and ninety three only (Rs.

70,83,793/-) and release the

earnest money deposit and Bank

Guarantees furnished by the

claimant in lieu of Security

Deposit, in full settlement of all

claims and counter-claims."

Calling the award in question, an application to set it aside has been filed. The respondent filed an application to make the award the rule of the court. The civil Court dismissed the petition of the appellant and made the award the rule of the court. On appeal, the Division Bench of the High Court has confirmed the same. Thus these appeals, by special leave.

Shri V.R. Reddy, the learned Additional Solicitor General, contends that the award is illegal on account of omission on the part of the Umpire to give the findings and reasons in support thereof of the arbitrability of the claims. He contends that arbitrability of claim is a jurisdictional issue. The arbitrator cannot clothe himself with the power, in a non-speaking award to award a consolidated sum, without deciding the arbitrability of the claims set up by the respondents including those which are not part of the contract.

Shri Poti, learned senior counsel for the respondents has contended that the award being a non-speaking one in the absence of specific reference directing the Arbitrators to decide the arbitrability of some of the items in the claims set up by the respondent, Umpire was not called upon or obliged to decide the dispute by a speaking order on arbitrability. He reached the conclusion whether or not the dispute or the claim is arbitrable and obviously he was of the opinion that all the claims are arbitrable and he is empowered to decide it either rightly or wrongly. He may be wrong in not expressly giving his decision on arbitrability of some of the claims. However, his decision is within his jurisdiction. He is not required to give any reasons in the award for reaching that decision. When the arbitrator had given a consolidated sum towards all the claims, it would mean that he had considered the arbitrability of some of the claims in terms of the contract and that, therefore, he has not committed any error in reaching that conclusion which is apparent on the face of the record. In the absence of any specific reference for deciding that dispute, even if incidentally he reaches that decision, he gets the jurisdiction and power to decide the question, he gets the otherwise also, the award cannot be assailed o n the ground that he reached a wrong decision without any reasons in support thereof. In that event, it must be deemed that he had considered the non-arbitrability of the items in a nonspeaking ward given by him. He also further contends that i n the absence of any agreement between the parties that the arbitrator would give reasons in support of his decision on the arbitrability of the dispute, he is not called upon to decide the dispute by a speaking award. What is required, therefore, is to be considered is whether the arbitrator reached the decision as to the entitlement to for a specified sum or disentitlement thereof, in his award. Once he specifies the amount to which the respondent is entitled, it must be deemed that he had taken into consideration the arbitrability of all the claims including the claim relating to nonarbitrability of some of the items and had given the award. Thereby, consolidated sum in the award is not subject to attack that the award made by the Arbitrator is vitiated by any error of jurisdiction or error of law apparent on the face of the record. Shri Poti further contends that the contract of arbitration is not part of the record and the umpire had not referred to the agreement as part of the award and that, therefore, it is not open to the court to look into the contract to find out whether the contractor claimed at the rates higher than what were contracted and the umpire has omitted to consider the nonarbitrability of the claims in respect of some of the items. In support thereof, the places strong reliance on the decision of this Court in Tarapore and Co. v. Cochin Shipyard Ltd., Cochin [(1984) 2 SCC 680], in particular, paragraphs 10, 12,33 thereof, and State of A.P. v. R.V. Rayanim [(1990) 1 SCC 433 at 435, para 5].

In view of the respective contentions, the question that arises for consideration is: whether the Umpire was required to give a decision supported by reasons on the nonarbitrability of some of the items in terms of the contract. It is already seen that the Court prior to the proceedings under Section 33 had gone into the question as to the right of the appellant to question the arbitrability of some of the items and had expressly recorded, as seen hereinbefore, that if any objection regarding the dispute is raised, either parties is at liberty to raise the same and avail of decision by the arbitrator and the arbitrator is required to decide the arbitrability of the claim and if he considers that it falls within the scope of the arbitration clause/arbitrability, then he would have the jurisdiction to decide the same. If the decision has been reached by the arbitrator against the appellant, it would be open to the Board to raise that point, in case any need arises for setting aside the said award in the court. Thus, it could be seen that prior to the proceedings under Section 33, the court had left open the umpire had to decide the dispute. In the event of the decision going against the Board, the same is also entitled to question the correctness of the award in a court of law. That order has become final.

In the light of the above facts, the question arises; whether the arbitrator was not obliged to decide the nonarbitrability of some of the items claimed by the respondents before/while giving a non-speaking award and whether a deemed decision could be given credence. In Tarapore Co.’s case relied on by Shri Poti, a Bench of two judges of this court had gone into the question of jurisdiction of the arbitrator to decide the arbitrability of the dispute. In para 10 thereof, it is stated thus :

"What is the effect of referring

the specific question of law to

arbitration without prejudice to

one’s right to contend to the

contrary will be presently

examined."

If this issue specifically raises a

question as to jurisdiction of the

arbitrator to arbitrate upon the

dispute set out in Point No.2, it

appears to have been specifically

referred to the arbitrator for his

decision. Parties, therefore,

agreed to submit the specific

question even with regard to the

scope ambit width and the

construction of the arbitration

clause so as to define its

parameters and contours with a view

to ascertaining whether the claim

advanced by the appellant and

disputed by the respondent would be

covered by the arbitration clause.

Whether upon its true construction

the arbitration clause would

include within its compass the

dispute thus raised between the

parties was specifically put in

issue because parties were at

variance about it."

"The arbitrator was thus required

and called upon first to decide

whether the dispute is arbitrable

as falling within the width and

answer is in the affirmative, then

alone the second point need be

examined. If the answer to the

first point of reference is in the

negative in that if the arbitrator

were of he opinion that the dispute

is not arbitrable as it would not

fall within the scope, width an

ambit of the arbitration agreement,

it would not be necessary for him

to determine whether the appellant

was entitled to recover anything by

way of compensation. This aspect is

being analysed in depth to point

out that the parties specifically

referred the question of

constriction of arbitration

agreement, its width, ambit and

parameters vis-a-vis the dispute

raised so as to decide whether the

dispute would fall within the

purview of the arbitration

agreement, in other words the

jurisdiction of the arbitrator."

Thus, it could be seen that therein that when the question is specifically referred to the arbitrator, the arbitrator is required to decide the question referred to him and decide the point on the question. Then only he gets the jurisdiction to go into the merits. In para 12 of the judgment that point was elaborated holding that :

"The first point extracted

hereinbefore would clearly show

that the specific question about

the jurisdiction of the arbitrator

to arbitrate upon the dispute set

out in Point Nos. 2, 3 and 4 was

specifically referred to the

arbitrator.

On the first point, the arbitrator

had to decide whether the claims

made by the appellant and disputed

by the respondent would be covered

by clause 40, i.e. the arbitration

clause. In other words, the

specific question referred to the

arbitrator was about his

jurisdiction to arbitrate upon the

disputes covered by Points Nos. 2,

3 and 4, if and only if, upon a

true construction of the

arbitration clause that is first

paragraph of clause 40, would cover

the disputed claim for compensation

he can enter into the merits of the

dispute and decide it."

This ratio clearly establishes that the arbitrator gets jurisdiction to decide the dispute on merits only when he is specifically called upon to decide the dispute in terms of the contract.

In Managing Director, J & K Handicraft v. Good Luck Carpets [(1990) 4 SCC 740], the question arose: whether the court could look into the arbitration agreement, find out whether the arbitrator has jurisdiction to decide the dispute though it was not formed part of the award? In para 5, this Court had held that:

"... Here we may point out that the

learned counsel for the respondent

has urged that the agreement

containing the arbitration clause

cannot be looked into even to find

out as to what was the nature of

the dispute contemplated by it with

regard to which a reference to an

arbitrator was contemplated, more

so when the ward was a non-speaking

one. We find it difficult to agree

with this submission for two

reasons: Firstly, the award is not

a totally non-speaking one

inasmuch as it gives as resume of

the incentive scheme and the

agreement between the parties as

also the items of the claim made by

the respondent. Of course, while

fixing the amount found payable by

the appellant, no reasons are

recorded. Secondly, if there is any

challenge to the award on the

ground that the arbitrator had no

jurisdiction to make the award with

regard to a particular item

inasmuch as it was beyond the scope

of reference, the only way to test

the correctness of such a challenge

is to look into the agreement

itself. In our opinion, looking

into the agreement for this limited

purpose is neither tantamount to

going into the evidence produced by

the parties nor into the reason

which weighted with the arbitrator

in making the award."

In fact this Court had gone into merits while deciding the question as to whether the arbitrator was justified in making the award in excess of the jurisdiction with reference to the arbitration agreement and deciding the dispute on that basis.

In U.P. Rajkiya Nirman Nigam Ltd. v. Indure Pvt. Ltd. [(1996) 2 SCC 667] a Bench of three judges [to which both of us were members] had gone into the question whether the arbitrator can go into the question whether there emerged any concluded contract and whether he can get exclusive jurisdiction to decide that question by himself? In an application under Section 33, the learned Single Judge of the High Court had held that the arbitrator has exclusive jurisdiction to decide that question. Reversing that judgment this Court in para 13 had held that "the arbitrability of a claim depends on the construction of the clause in the contract. The finding of the arbitrator/arbitrators on arbitrability of the claim is not conclusive as under Section 33, ultimately it is the court that decides the controversy. It being a jurisdictional issue, the arbitrator/arbitrators cannot clothe themselves with jurisdiction to conclusively decide the issue." In para 15 it is held thus:

"The clear settled law thus is that

the existence or validity of an

arbitration agreement shall be

decided by the court alone,

Arbitrators, therefore, have no

power of jurisdiction to decide or

adjudicate conclusively by

themselves the question since it is

the very foundation on which the

arbitrators proceed to adjudicate

the disputes. Therefore, it is

rightly pointed out by Shri Adarsh

Kumar Goel, learned counsel for the

appellant that they had by mistake

agreed for reference and that

arbitrators cold not decide the

existence of the arbitration

agreement or arbitrability of the

disputes without prejudice to their

stand that no valid agreement

existed. Shri Nariman contended

that having agreed to refer the

dispute, the appellant had

acquiesced to the jurisdiction of

the arbitrators and, therefore,

they cannot exercise the right

under Section 33 of the Act. We

find no force in the contention. As

seen, the appellant is claiming

adjudication under Section 33 which

the court alone has jurisdiction

and power to decide whether any

valid agreement is existing between

the parties. Mere acceptance or

acquiescing to the jurisdiction of

the arbitrators for adjudication of

the disputes as to the existence of

the arbitration agreement or

arbitrability of the dispute does

not disentitle the appellant to

have the remedy under Section 33

through the court. In our

considered view the remedy under

Section 33 is the only right royal

way for deciding the controversy."

Accordingly, it was held that the controversy of arbitrability requires to be decided by the court and not by the arbitrator himself.

In Union of India v. G.S. Atwal & Co. (Asansole) [(1996) 3 SCC 568] a Bench of two Judges, to which one of us, K. Ramaswamy, J. was a member, was to consider the question whether the arbitrator. when he enlarged his scope of award in a non-speaking award, can conclusively decide the dispute and give an award in that behalf? It was held in paragraph 6 that :

"To constitute an arbitration

agreement, there must be an

agreement that is to say the

parties must be ad idem.

Arbitrability of a claim depends

upon the dispute between the

parties and the reference to the

arbitrator. On appointment, he

enters upon that dispute for

adjudication. The finding of the

arbitrator on the arbitrability of

the claim is not conclusive, as

under Section 33 ultimately it is

the court that decides the

controversy. It can hardly be

within the arbitrator’s

jurisdiction to decide whether or

not a condition precedent to his

jurisdiction has been fulfilled.

The arbitrator had has been

fulfilled. The arbitrator had no

power to decide his own

jurisdiction. The arbitrator is

always entitled to inquire whether

or not he has jurisdiction to

decide the dispute. He can refuse

to deal with the matter at all and

leave the parties to go to the

court if he comes to the conclusion

that he has no power to deal with

the matter, or he can consider the

matter and if he forms the view

that the contract upon which the

claimant is relying on and from

which, if established, he alone has

jurisdiction, he can proceed to the

decide the dispute accordingly.

Whether or not the arbitrator has

jurisdiction and whether the matter

is referred to or is within the

ambit of clause for reference of

any difference of dispute which may

arise between the parties, it is

for the court to decide it. The

arbitrator by a wrong decision

cannot enlarge the scope of the

submission. It is for the court to

decide finally the arbitrability of

the claim in dispute or any clause

or a matter or a thing contained

therein or the construction

thereof.:

In Champsey Bhara & Co. v. Jivraj Balloo Spinning & Weaving Co. Ltd. (LR (1922) 50 IA 324 : AIR 1923 PC 66] Lord Dunedin had laid down the dictum as to an error in law on the face of the award, which was accepted and followed by this court in Hindustan Construction Co. Ltd. v. State of J & K. [(1992) 4 SCC 217]. Therein it was held that:

"An error in law on the face of the

award means, in their Lordships’

view, that you can find in the

award or a document actually

incorporated thereto, as for

instance a note appended by the

arbitrator stating the reason for

his judgment, some legal

proposition which is the basis of

the award and which you can then

say is erroneous. It does not mean

that if in a narrative a reference

is made to a contention of one

party, that opens the door to

seeing first what the contention

is, and then going to the contract

on which the parties’ right depend

to see if that contention is sound.

Here it is impossible to say, from

what is shown on the face of the

award, what mistake the arbitrators

made. The only way that the learned

judges have arrived at finding what

the mistake was is by saying:

’inasmuch as the arbitrators

awarded so and so, and inasmuch as

the letter shows that the buyer

rejected the cotton, the

arbitrators can only have arrived

at arbitrators can only have

arrived at that result by totally

misinterpreting Rule 52’. But they

were entitled to give their own

interpretation to Rule 52 or any

other article, and the award will

stand unless, on the face of it,

they have tied themselves down to

some special legal proposition

which then when examined, appears

to be unsound."

The decision has been followed by this Court in all subsequent judgments and the precise scope of the law as to error apparent on the face of the award has been crystalised. But there is a distinction between an error apparent on the face of the award and jurisdictional error in passing the award. In that behalf, in M/s. Sudarsan Trading Co. v. State of Kerala [(1989) 2 SCC 38] Justice Sabyasachi Mukharji, as he then was, had pointed out the distinction on the jurisdictional error and the error on the face of the award. It was stated thus:

"An award may be remitted or set

aside on the ground that the

arbitrator in making it, had

exceeded this jurisdiction and

evidence of matters not appearing

on the face of it, will be admitted

in order to establish whether the

jurisdiction had been exceeded or

not, because the nature of the

dispute is something which has to

be determined outside the award-

whatever might be said about it in

the award or by the arbitrator. It

has to be reiterated that an

arbitrator acting beyond his

jurisdictionis a different ground

from the error apparent on the face

of the award. In Halsbury’s Laws of

England II, 4th edn., Vol.2 para

622 one of the misconducts

enumerated, is the decision by the

arbitrator on a matter which is not

included in the agreement or

reference. But in such a case one

has to determine the distinction

between an error in excess of the

jurisdiction. Whether a particular

amount was liable to be paid or

damages liable to be sustained, was

a decision within the competency of

the arbitrator in this case. By

purporting to construe the contract

the court could not take upon

itself the burden of saying that

this was contrary to the contract

and, as such, beyond jurisdiction.

It has to be determined that there

is a distinction between dispute as

to the jurisdiction of the

arbitrator and the disputes as to

in what way that jurisdiction

should be exercised. There may be a

conflict as to the power of the

arbitrator to grant a particular

remedy."

In "Russel on Arbitration" [Nineteenth Edition] by Anthony Walton, page 99, it is stated as under:

"It can, hardly be within the

arbitrator’s jurisdiction to decide

whether or not a precedent to his

jurisdiction has been fulfilled. It

has indeed several times been said

bluntly that an arbitrator has no

power to decide his own

jurisdiction and in one case where

rules of an institution the

arbitrator such power, the court

will ignore this when asked to

enforce the award, and decide the

question itself. However, an

arbitrator is always entitled to

inquire whether or not he has

jurisdiction.. An umpire faced with

a dispute whether or not there was

a contract from which alone his

jurisdiction, if any, can arise can

matter at all and lease the parties

to go to Court, or he can consider

the matter and if he forms the view

that the contract upon which the

claimant is relying and from

which, if established, alone his

jurisdiction can arise is in truth

the contract, he can proceed

accordingly."

In "Law of Arbitration" by R.S. Bachawat [2nd (1987) Edition] at pages 154-55, it is stated thus:

"An arbitrator cannot by mistake

assume jurisdiction over a matter

on which he has no jurisdiction. If

it is shown by the terms of the

submission or by the extrinsic

evidence that the arbitrator has

adjudicated upon matters outside

the scope of his authority the

award cannot stand, however well

meaning and honest the mistake

might have been. An arbitrator

cannot give himself jurisdiction by

a wrong decision collateral to the

merits as to facts on which the

limits of his jurisdiction depends.

Where it was a condition precedent

to his jurisdiction that the

dispute should have arisen during a

tenancy between the plaintiff and

the tenancy between the plaintiff

and the defendant or in the event

of a collusion if certain works had

been completed, the arbitrator

could not clothe himself with

jurisdiction by a wrong decision n

the preliminary point. The question

is not preliminary point. The

question is not concluded against

any party by a finding of the

arbitrator that he has

jurisdiction. It is for the court

and not for the arbitrator to

decide finally whether or not the

arbitrator has jurisdiction and

that is the law both in India and

in England."

"....The question whether the

matters referred were within the

ambit of the clause for reference

of "any difference or dispute which

may arise between the partners is

for the court to decide".

"....Dispute about the existence or

validity of the contract and as to

the existence of facts which render

it illegal must be determined by

the court and not by the

arbitrator. The arbitrator cannot

by his own finding clothe himself

with jurisdiction. Supposing he

finds that the jurisdiction

agreement is valid such a finding

cannot bind the parties".

It would thus be seen that the arbitrator, while deciding the admitted dispute, subject matter of adjudication, may decide the dispute in reference to the agreement. That would be within his jurisdiction. In such jurisdictional issue, even if an error is committed that may not be an error apparent on the face of the record because the arbitrator, the chosen forum, may commit an error in exercising his jurisdiction. However, if he, by a speaking award, decides it on a wrong proposition of law, it will be an error apparent on the face of record and liable to correction. If the arbitrator decides a dispute which is beyond the scope of his reference or beyond the subject matter of the reference or he makes the award disregarding the terms of reference or the arbitration agreement or terms of the contract, it would jurisdictional error beyond the scope of reference, he cannot clothe himself to decide conclusively that dispute as it is an error of jurisdiction which requires to be ultimately decided by the court. This Court has pointed out the distinction between latent and patent error of jurisdiction in Tarapore Co.’s case thus:

"It has to be seen whether the

terms of the agreement permitted

entertainment of the claim by

necessary implication. It may be

stated that we do not accept the

broad contention of Shri Nariman

that whatever is not excluded

specifically by the contract can be

subject-matter of claim by a

contractor. Such a proposition will

mock at the terms agreed upon.

Parties cannot be allowed to depart

from what they had agreed. Of

course, if something flows as a

necessary concomitant to what was

agreed upon courts can assume that

too as a part of the contract

between the parties."

It would thus be clear that the arbitrator cannot clothe himself conclusively with the jurisdiction to decide or omit to decide the arbitrability of a particular item or the claim made by the parties. When a specific reference has been made to the arbitrator and the parties raise the dispute of arbitrability, with the leave of the court/by a direction of the court in a proceedings under Section 33, he is to decide the arbitrability of the dispute and make a decision of the arbitrability f the dispute and make a decision while giving reasons in support thereof. The decision of the arbitrator in granting a particular sum by a non-speaking award, therefore, hinges upon the arbitrability of a dispute arising under the contract or upon a particular item claimed thereunder. He is required to give the decision thereon. The question of decision by implication does not arise since his jurisdiction to decide to dispute on merits hinges upon his jurisdiction to decide the arbitrability of the dispute. In this case, in view of the finding recorded by the court, which has become final, as referred to earlier, the arbitrator/umpire was enjoined to decide the arbitrabilty of the claims set up by the respondent and disputed by the appellant. Admittedly, the award of the umpire does not contain any decision on arbitrability of the claims.

In Gujarat Water Supply and Sewerage Board v. Unique Erectors [(1989) 1 SCC 532] one of the questions referred was arbitrability of a particular item. It was by the Court stated thus :

"In the instant case, the

arbitrator by virtue of the terms

mentioned in the order of this

court had to decide which of the

disputes were arbitrable and which

were not. It is true that the

arbitrator has not specifically

stated in the award that he had to

decide the question of

arbitrability. The arbitrator has

rested by stating that he had heard

the parties on the point of

arbitrability of the claim and the

counter-claim. He has further

stated that after ’considering all

the above aspects’ and ’the

question of arbitrability or non-

arbitrability’ he had made the

award on certain aspects."

It could be seen that if the arbitrator has indicated his mind in the award that he in fact adverted to the arbitrability or non-arbitrability of the claim and then made the award, it would be indicative of the fact that he had, in fact, applied his mind, considered that question and reached the decision in awarding certain amounts by a non-speaking award including the claim in respect of which arbitrability was in issue.

In Raipur Development Authority v. Chokhamal Contractors [(1989) 2 SCC 721], a Constitution Bench of this Court had gone into the question whether the arbitrator is required to give reasons in a non-speaking award. The Constitution Bench had pointed out in para 35 thus:

"We do not appreciate the

contention, urged on behalf of the

parties who contend that it should

be made obligatory on the part of

the arbitrator to give reason for

the award, that there is no

justification to leave the small

area covered by the law of

arbitration out of the general rule

that the decision of every judicial

and quasi-judicial body should be

supported by reasons. But at the

same time it has to be borne in

mind that what applies generally to

settlement of disputes by

authorities governed by public law

need not be extended to all cases

arising under private law such as

those arising under the law of

arbitration which is intended for

settlement of private disputes."

In para 37 thereof, this Court emphasised the need to make a speaking award and the terms in the contract should postulate such a need when the contract is entered into by the State or its instrumentalities. It was held thus:

"The trappings of a body which

discharges judicial functions and s

required to act in accordance with

law with their concomitant

obligations for reasoned decisions,

are not attracted to a private

adjudication of the nature of

arbitration as the latter, as we

have noticed earlier, is not

supposed to exert the State’s

sovereign judicial power. But

arbitral awards in disputes to

which the State and its

instrumentalities are parties

affect public interest and the

matter of the manner in which

government and its

instrumentalities allow their

interest to be affected by such

arbitral adjudications involve

larger questions of policy and

public interest. Government and its

instrumentalities cannot simply

allow large financial interests of

the State to be prejudicially

affected by non-reviewable - except

in the limited way allowed by the

statute - non-speaking arbitral

awards. Indeed, this branch of the

system of dispute resolution has,

of late, acquired a certain degree

of notoriety by the manner in which

in many cases the financial

interests of government have come

to suffer by awards which have

raised eyebrows by doubts as to

their rectitude and property. It

will not be justifiable for

governments or their

instrumentalities to enter into

arbitration agreements which do not

expressly stipulate the rendering

of reasoned and speaking awards.

Government and their,

instrumentalities should, as a

matter of policy and public

interestif not as a compulsion of

law ensure that wherever they enter

into agreements for resolution of

disputes by resort to private

arbitrations, the requirement of

speaking awards is expressly

stipulated and ensured."

In State of A.P. & Ors. v. R.V. Rayanim & Ors. [(1990) 1 SCC 433], relied on by Shri Poti, the question arose whether the award of escalation charges in a non-speaking award is vitiated by any error apparent on the face of the record? Therein the question of jurisdictional issue had not arisen. On the other hand, on merits, it was contended that there was an error in that behalf. In para 5 it was held that " it was then contended, that the award has purported to grant damages on the basis of escalation of cost and prices and such escalation was not a matter within the domain of the bargain between the parties and having taken that factor into consideration the award was bad." Therefore, the ratio there is an authority supporting the contention on the need of an arbitrator to give a reasoned decision on arbitrability of the contract or claim in dispute.

In this regard, Section 31(3) of the Arbitration and Conciliation Act, 1996, provides thus:

"(3) The arbitral award shall state

the reasons upon which it is based,

unless-

(a) the parties have agreed

that no reasons are to be given, or

(b) the award is an arbitral

award on agreed terms under Section

30."

The Parliament has expressed the legislative judgement that the award shall state reasons upon which it is based unless parties have agreed otherwise or the award is covered on agreed terms under Section 30 of the new Act.

Thus, the law on the award, as governed by the new Act, is other way about of the pre-existing law; it mandates that the award should state the reasons upon which it is based. In other words, unless (a) the parties have agreed that no reasons are to be given or (b) the award is an arbitral award on agreed terms under Section 30 of the new Act, the award should state the reasons in support of determination of the liability/non-liability. Thereby, legislature has not accepted the ratio of the Constitution Bench in the Chokhamal Contractor’s case that the award, being in the private law field, need not be a speaking award even where the award relates to the contact of private parties or between person and the Government or public sector undertakings. The principle is the same, namely the award is governed by Section 31(3).

We have set out the relevant portions of the award. From a reading thereof, it is clear that the arbitrator had considered the claims made on the basis of escalation and damages, in a non-speaking award of the disputes consisting of arbitrable and non-arbitrable claims. He awarded a lumpsum amount of Rs. 70,83,793/-. It is difficult to discern as to what extent the umpire had considered the admissible and inadmissible claims which he adjudged. In such a situation, it is not possible to discern to what extent he had exercised his jurisdiction vis-a-vis of the admissible claims and disallowed the non-arbitrable claims. So, it is not clear whether he exercised his authority either beyond his jurisdiction or in abdication thereof. In either case, it is an error of jurisdiction, the very foundation for his decision.

It is well settled that in the matter of challenge to the award there are two distinct and different grounds, viz., that there is an error apparent on the face of the record and that the arbitrator has exceeded his jurisdiction. In the latter case, the court can look into the arbitration agreement but under the former it cannot do so unless agreement but under the former it cannot do so unless the agreement was incorporated or cited in the award or evidence was made part of the agreement. In the case of jurisdictional error, there is no embargo on the power of the court to admit the contract into evidence and to consider whether or not the umpire had exceeded the jurisdiction because the nature of the dispute is something which has to be determined, outside the award, whatever might be said about it in the award or by the arbitrator. In the case of non-speaking award, it is not open to the court to go into the merits. Only in a speaking award the court can look into the reasoning in the award and correct wrong proposition of law or error of law. It is not open to the court to probe the mental process of the arbitrator and speculate, when no reasons have been given by the arbitrator, as to what impelled the arbitrator to arrive at his conclusion. But in the later case the court, with reference to the terms of the contract/arbitrator/umpire has exceeded his jurisdiction in awarding or refusing to award the sum of money awarded or omitted a consolidated lumpsum.

In fact, in G.S. Atwal & Co.’s case, having noticed that the arbitrator had exceeded his jurisdiction to grant amount de hors the terms of the contract and being a nonspeaking award, the court was unable to speculate as to what extent the award was within the terms of the contract or claims made and to what extent the amount awarded was in respect of non-arbitrable dispute. Accordingly, the order of the civil court was set aside reversing the judgment of the Division Bench of the Calcutta High Court.

Thus considered, we hold that the arbitrator, having been invested with the jurisdiction to decide the arbitrability of certain claims, has committed error of jurisdiction in not considering the arbitrability of the claims and passed a non-speaking award, awarding a sum of Rs. 70.83 lakhs and odd. It is difficult to ascertain as to what extent he has awarded the claims within the contract or the claims outside the contract, of a total claim of Rs. 2.10 crores. Under those circumstances, we are constrained to hold that it is difficult to give acceptance to the award made by the umpire as upheld by the courts below. Equally, we find it difficult to accept the contention that out of a claim of Rs. 2.10 crores, only a sum of Rs. 70.83 and odd was awarded. So, it is not a fit case for interference on the basis of the mere fact that a lesser sum than was claimed has been awarded. An illegal award cannot be upheld to be valid or within jurisdiction.

The question then is : what procedure should be adopted in this behalf? The contention of Shri Poti is that it may be remitted to the umpire for fresh consideration. On the other hand, the contention of Shri V.R. Reddy is that in the event of the conclusion that the arbitrator has exceeded his jurisdiction, the entire award would become invalid and it has to be set at naught. Having given due consideration to the respective contentions, we find force in the contention of Mr. V.R. Reddy. Mr. Poti has stated that though it is found that the award is not valid in law, the party cannot be made to suffer on account of the illegality committed by the umpire. We find no force in the contention. Once a finding recorded that the umpire/arbitrator has committed error of jurisdiction, as stated earlier, two course are open, viz., either to remit the award to the umpire for reconsideration or to set aside the award in toto. We think that the latter course would be appropriate in the facts and circumstances in this case.

Accordingly, we allow the appeals set aside the award of the arbitrator and leave the parties to bear their own costs. If there are no outstanding dues recoverable from the respondents, the security deposit and bank guarantee is required to be refunded to the respondent.

Ask CaseMinister about Tamilnadu Electricity Board v. M/S.bridge Tunnel Construction Co.

Your 24×7 legal assistant on WhatsApp answers with the judgments that apply, in English or Hindi. No signup needed.

Questions about this judgment, or a case like it?Ask on WhatsApp