P.S. Rajya v. State of Bihar

Supreme Court of India · 9 May 1996 · [1996] SUPP. 2 S.C.R. 631

Court
Supreme Court of India
Decided
9 May 1996
Case no.
Crl.A. No. 434 of 1996
Reported as
[1996] SUPP. 2 S.C.R. 631
Bench
Venkataswami K. (J)
Length
11 pages
Have a question about this judgment?

Ask our Legal AI about it on WhatsApp: free, no signup, in English or Hindi.

Write it first.

PETITIONER:
P.S.RAJYA
Vs.
RESPONDENT:
THE STATE OF BIHAR
DATE OF JUDGMENT: 09/05/1996
BENCH:
VENKATASWAMI K. (J)
ANAND, A.S. (J)
CITATION:
JT 1996 (6) 480 1996 SCALE (4)344

ACT

HEADNOTE

JUDGMENT

ORDERK. VENKATASWAMI, J.

Heard learned counsel for the parties.

The appeal was allowed with costs by our Order dated 27.3.1996 reserving the reasons to be given later. Now the reasons are given.

The short question that arises for our consideration in this appeal is whether the respondent is justified in pursuing the prosecution against the appellant under section 5(2) read with section 5(1)(e) of the Prevention of Corruption Act 1947 notwithstanding the fact that on an identical charge the appellant was exonerated in the departmental proceedings in the light of a report submitted by the Central Vigilance Commission and concurred by the Union Public Service Commission.

Short facts are as under :

The appellant started his career in a college in the year 1955 and switched over to TISCO in the year 1959 till he was selected and appointed as Inspector in the Income Tax Service in the year 1961. The appellant’s wife was also a teacher in the Central School at Bokaro Steel City. She was allotted on long lease a plot at Bokaro in the year 1980 for a sum of Rs. 20,000/- by the Steel Authority of India Limited (for short "SAIL"). As per terms and conditions imposed by SAIL, shops in the ground floor and residence at first floor were constructed by the appellant with his earnings as well as the earnings of his wife. The construction was strictly under the supervision and on the drawings supplied freely by SAIL township authority. Subsequently the building was valued by SAIL township engineer at Rs.4.75 lakhs.

The appellant in the meanwhile got promotion and was functioning as Income-tax Officer A-Ward, Dhanbad from 1981 to 1985. It appears that in the course of discharge of his duties, he impounded the books of accounts of certain business people who seemed to have complained to the local Congress Party M.P. who in turn complained about the appellant to the Minister of Finance with a request to transfer the appellant and to order for a CBI inquiry. Accordingly, an FIR was lodged on 9.4.1986 and the appellant’s residence and office were raided on 11.4.86. However, nothing worth mentioning was found. Ultimately a charge-sheet was filed on 31.7.89 showing the assets of the appellant consisting of cash, immovable property (house) and jewellery as follows :

i) Building at Bokaro Rs. 7,69,300.00

ii) NSCs Rs. 82,500.00

iii) Bank balance Rs. 1,584.91

iv) Household articles Rs. 1,34,709.00

__________________

Total Rs. 9,88,093.91

------------------

As against this the estimated savings for the check period (1973 to March 1986) was arrived at in the sum of Rs. 6,30,000/- and on that basis it was alleged that the assets were disproportionate to the extent of Rs. 3,57,439.00.

The appellant aggrieved by the above charge being taken cognizance of by the Special Judge challenged the same by moving the Patna High Court under section 482 Cr.P.C. The High Court by order dated 3.8*90 allowed the petition and remitted the matter back to, the Special Judge directing him to get a preliminary enquiry conducted by higher authority of the appellant or do it himself before taking cognizance of the matter.

It is the grievance of the appellant that without strictly complying with the remit order of the High Court, the Special Judge took cognizance of the matter and wanted to proceed further. Aggrieved by that the appellant again moved the Patna High Court under section 482 Cr.P.C. for quashing the cognizance of charge as mentioned above. This time the High Court dismissed the petition holding that the issues raised before it have to be gone into in the final proceedings and those cannot be raised at the preliminary stage.

The appellant aggrieved by the Order of the High Court has filed the above appeal by Special Leave.

It may not be quite out of place just to mention how the appellant was persecuted, if we may use that expression on the facts of this case.

On the basis of the FIR and consequential raid the appellant was placed under suspension on 24.11.86. No progress was shown nearly for two years which obliged the appellant to move the Central Administrative Tribunal, Calcutta ("CAT" for short). On 1.6.88 the Tribunal directed the Government to complete the investigation within three months failing which the fresh consideration. The appellant again moved the Central Administrative Tribunal, Patna for promotion and other reliefs which in turn directed the revocation of the order of suspension and also to release all increments from 1987 onwards and for opening of the sealed cover in which the appellant’s promotion order had been placed by the Department. That order of the CAT was challenged by the Department in this Court and this Court dismissed the Special Leave Petition on 14.10.91. Simultaneously the appellant was given a departmental charge-sheet containing identical charges. For more than two years no progress was made by the Department as no Inquiry Officer was appointed. Again, the appellant was forced to move the CAT, Patna for quashing the departmental chargesheet. A direction was given by the CAT, Patna on 22.2.1993 to complete the departmental enquiry by 15.5.1995. The departmental enquiry was conducted by Central Vigilance Commission and the Central Vigilance Commission after a detailed enquiry submitted a report exonerating the appellant of all the charges. The Department forwarded the report of the Central Vigilance Commission for the opinion of the Union Public Service Commission. By a long report, the Union Public Service Commission concurred with the conclusion of exonerating the appellant of all the charges. Accepting the report of the Union Public Service Commission, the President order of suspension would automatically stand revoked. Since the CBI did not complete the investigation as directed by CAT, the suspension stood automatically revoked. Thereafter the CBI got the appellant’s house inspected by a team of three C.P.W.D. engineers on 27.9.88 on which date the appellant and his family members were away and the house was locked. The appellant was forced to move Central Administrative Tribunal, Patna for getting his promotional order and in that course the Tribunal passed some strictures against the authorities. At last the CBI filed a chargesheet on 31.7.89 and the main basis for this charge-sheet was the valuation of the appellant’s house at Bokaro which the CBI fixed at Rs. 7,69,300.00 as against the earlier valuation by the Income-tax Department at Rs. 4.67 lakhs.

We may also mention that the only ground on which the arguments were addressed both by the learned counsel for the appellant and the learned Sr. counsel for the respondent centered round the valuation fixed by the CBI to the appellant’s house at Bokaro.

Soon after the Special Judge took cognizance of the charge, the appellant was again placed under suspension on 31.5.90. As mentioned above by order dated 3.8.90 High Court of Patna quashed the cognizance taken by the Special Judge and remitted the matter for fresh consideration. The appellant again moved the Central Administrative Tribunal, Patna for promotion and other reliefs which in turn directed the revocation of the order of suspension and also to release all increments from 1987 onwards and for opening of the sealed cover in which the appellant’s promotion order had been placed by the Department. That order of the CAT was challenged by the Department in this Court and this Court dismissed the Special Leave Petition on 14.10.91. Simultaneously the appellant was given a departmental charge-sheet containing identical charges. For more than two years no progress was made by the Department as no Inquiry Officer was appointed. Again, the appellant was forced to move the CAT, Patna for quashing the departmental chargesheet. A direction was given by the CAT, Patna on 22.2.1993 to complete the departmental enquiry by 15.5.1995. The departmental enquiry was conducted by Central Vigilance Commission and the Central Vigilance Commission after a detailed enquiry submitted a report exonerating the appellant of all the charges. The Department forwarded the report of the Central Vigilance Commission for the opinion of the Union Public Service Commission. By a long report, the Union Public Service Commission concurred with the conclusion of exonerating the appellant of all the charges. Accepting the report of the Union Public Service Commission, the President passed the final orders in favour of the appellant. In spite of that we are informed that the appellant has not got the full retrial benefits.

Now reverting to the merits of the case it is the contention of the learned counsel for the appellant that in view of the clear reports of the Central Vigilance Commission and the Union Public Service Commission concerning identical departmental charge, there is absolutely nothing for the prosecution to proceed further. He also submitted that notwithstanding the direction of the High Court to the Special Judge to hold a preliminary enquiry before taking cognizance of the charge sheet either by himself or through higher authorities of the appellant, the learned Special Judge has taken cognizance once again without holding any preliminary enquiry. Therefore, the order of the Special Judge taking cognizance of the chargesheet confirmed by the High Court cannot be sustained. On this point he placed reliance on a judgment of this Court in the case of P.Siraiuddin vs. State of Madras [1970 (3) S.C.R. 931]. According to Mr. Prashant Bhushan the result of departmental enquiry must be taken as preliminary enquiry and in view of the exoneration order, further proceedings in criminal charge should be dropped. It is the further submission of the learned counsel, for the appellant that the very same engineers who have given the report earlier to the Income-tax Department now at the instance of the CBI, presumably on pressure, have given different valuation and here again there are over-writings and alterations in several places. According to the learned counsel the Central Vigilance Commission has dealt with this aspect in its report elaborately and ultimately came to a conclusion that the subsequent valuation reports on which CBI placed reliance are of doubtful nature. The same view was taken by the Union Public Service Commission. Even otherwise the value given as basis for the charge-sheet is not the value given in the report subsequently given by the valuers.

Mr. Malhotra, learned Senior Counsel appearing for the respondent, contended that both the learned Special Judge and the learned Single Judge of the High Court have not shut out the appellant from establishing his case in the final hearing and the points now raised can very well be established by giving evidence at the appropriate time and there is no case made out for quashing the charge itself. According to the learned counsel notwithstanding the findings rendered under the departmental enquiry, the CBI is entitled to proceed on the basis of the material available and the mere allegation that the reports regarding the value of the building was of doubtful nature will not take the place of proof and that has to be gone into and established in the final hearing after taking evidence of the concerned valuers. He, therefore, supported the orders of the learned Special Judge and the learned Single Judge of the High Court

At the outset we may point out that the learned counsel for the respondent could not but accept the position that the standard of proof required to establish the guilt in a criminal case is far higher than the standard of proof required to establish the guilt in the departmental proceedings. He also accepted that in the present case, the charge in the departmental proceedings and in the criminal proceedings is one and the same. He did not dispute the findings rendered in the departmental proceedings and the ultimate result of it. On these premises, if we proceed further then there is no difficulty in accepting the case of the appellant. For if the charge which is identical could not be established in a departmental proceedings and in view of the admitted discrepancies in the reports submitted by the valuers one wonders what is there further to proceed against the appellant in criminal proceedings. In this context, we can usefully extract certain relevant portions from the report of the Central Vigilance Commission on this aspect.

"Neither the prosecution nor the

defence has produced the author of

various reports to confirm the

valuation. The documents cited in

the list of documents is a report

signed by two engineers namely

S/Sh. S.N.Jha and D.N. Mukherjee

whereas the document brought on

record (Ex. S-20) has been signed

by three engineers. There is also

difference in the estimated value

of the property in the statement of

imputation and the report. The

document at Ex.S-20 has been signed

by three engineers and the property

has been valued at Rs. 4,85,000/-

for the ground floor and Rs.

2,55,600/- for the second floor. A

total of this comes to

Rs.7,40,900/- which is totally

different from the figure of Rs.

7,69,800/-indicated in the

statement of imputation. None of

the engineers who prepared the

valuation report though cited as

prosecution witnesses appeared

during the course of enquiry. This

supports the defence argument that

the authenticity of this document

is in serious doubts. It is a fact

that the Income Tax Authorities got

this property evaluated by S/Sh.S

N.Jha and Vasudev and as per this

report at pages 50 to 63 they

estimated the property at Rs.

4,57,600/- including the cost of

land Rs. 1,82,000/- for ground and

manezaine floor plus Rs. 2,55,600/-

for first floor and Rs. 20,000/-

for cost of land). Thus both the

engineers who prepared the

valuation report for income tax

purposes also prepared the report

for the CBI and there is no

indication in the subsequent report

as to why there is a difference in

the value of the property. A

perusal of these two reports

reveals that there is difference in

the specification of the work. The

valuation report prepared by Sh.

S.N.Jha for ground floor for income

tax purposes clearly states that

the structure was having "RCC

Pillars at places, brick work in

cement mortar, RCC lintal, 60 cm

walls, 9 inch floor neight, 17.6,

8.00, 8.00 inch" but in the report

for CBI which was also prepared by

him the description is "RCC framed

structure open warandah on three

sides in the ground floor.

Similarly, for the first floor it

is written in the report as "partly

framed structure and partly load

being walls, floor heights 3.20 mm.

Further Sh. S.N.Jha on page 54 of

Ex. D1 had adopted a rate of Rs.

290 per sq. mtr for ground floor

and adding for extra height he had

estimated ground floor including

mezaine floor at Rs.2,02,600/-. But

for the report at Ex.S-20 the rate

has been raised to 365 per sq.mtr.

There is no explanation for this

increase of rate by Rs. 75 per mtr.

It is also observed that for the

updating of the cost of index 5-%

was added to the rate of Rs. 290/

as per page 55 of Ex. D-1 by Sh.

S.N. Jha but this has been raised

to 97% as an esclanation to the

cost of index in Ex.S-20 without

explaining or giving the reasons

therefore. It is surprising that

same set of engineers have adopted

different standard for evaluating

the same property at different

occasions. Obviously, either of the

report is false and it was for the

prosecution to suitably explain it.

In the absence of it the only

inference to be drawn is that

report at Ex-S-20 is not authentic.

Since the same set of engineers

have done the evaluation earlier

and if subsequently they felt that

there was some error in the earlier

report, they should have explained

detailed reasons either in the

report itself or during the course

of enquiry. Therefore, Ex.S-20 is

not reliable.

20. Moreover a perusal of Ex. S-20

reveals that Sh. Vasudev, Executive

Engineer has recorded a note as

follows :

"Hence the valuation of Sh.

S.N.Jha was never superceded by any

other estimates. As is confirmed

from the records, his estimated

figures were only accounted for by

the ITO Bokaro".

Thus according to Sh. Vadusev,

who was the senior-most among the

three CPWD engineers who prepared

Ex.S-20, the valuation of ground

floor remains at Rs.1,82,600/- plus

Rs.20,000/- for the cost of land.

The first floor as per Ex.S-20 was

estimated at Rs. 2,55,600/- and a

total of all this comes to Rs.

4,57,600/- which is very nearer to

the declaration of actuals to the

income tax authority and also the

estimated cost by the Bokaro Steel

Township Engineer and the Govt.

approved valuer.

21. It is clear from the above

discussions that though the

document cited in Annexure III is a

joint report of two engineers what

has been brought on record is a

document signed by three engineers

the same set of engineers evaluated

the property for income tax

purposes and there is a vast

difference in the specifications

and the rates adopted for

calculating the cost in Ex.S-20

have been increased without any

explanation and none of these

engineers were produced during the

course of enquiry to clarify the

position. Hence the authenticity of

Ex. S-20 is doubtful as claimed by

the defence.

22. It needs to be mentioned that

the report at Ex.S-20 has evaluated

the ground floor at Rs. 4,85,300/-

and a note to the effect that 10%

should be allowed for self

supervision and procurement of

material has also been recorded at

the end. On this basis the net

value of ground floor comes to Rs.

4,36,810/- (Rs. 4,85,344 -

Rs.48,534). The first floor has

been evaluated at Rs. 2,55,600/-

after allowing the allowance for

self supervision and a total of

both items would come to Rs.

6,62,410/-. Thus, even the report

at ex. S-20 does not support the

prosecution case that as per the

report of CPWD Engineers the

property is valued at Rs.

7,69,800/-. As the property

assessed by the income tax

authority for Rs. 4.67 lakhs and

even the valuation given by the

Bokaro Steel Township Engineer and

the Govt. approved valuer are very

nearer to this figure, the

reasonable value of this property

could only be taken as 4.75 lakhs

assessed by the Bokaro Township

Engineer on detailed estimate

basis."

It may not be out of place to extract a portion from the order exonerating the appellant from the charge framed in the departmental proeedings. It reads as follows :

"The Commission after careful

consideration of the facts and

records of the case, have advised

that the savings of the applicant,

Shri P.S. Rajya, were more than the

assets acquired by him and,

therefore, the charge of

acquisition of assets

disproprotionate to income does not

stand proved. A copy of the advice

of the Commissioner is enclosed.

The Commission have also advised

that the ends of justice would be

met by exonerating the charged

Officer, Shri P.S. Rajya.

The President has given careful

consideration to the facts and

records of the case and advice of

the UPSC. The President has come to

the conclusion that the advice of

the UPSC be acepted. It is,

therefore, held that the Articles

of charge framed against Shri Rajya

has not been proved. The President

is, therefore, pleased to exonerate

Shri Rajya, AIT (Retd.) of the

charges framed against him and drop

the proceedings initiated against

him."

We are inclined to think that the above extracts give a correct picture about the issue.

At the risk of repetition, we may state that the charge had not been proved and on that basis the appellant was cleared of departmental enquiry. In this connection, we may also usefully cite a decision of this Court in State of Haryana and Others vs. Bhajan Lal and Others (1992 Supp.(1) SCC 335). This Court after considering almost all earlier decisions has given guidelines relating to the exercise of the extra ordinary power under Article 226 of the Constitution or the inherent powers under Section 482 of the Code of Criminal procedure for quashing an F.I.R. or a complaint. This Court observed as follows ;

"In the backdrop of the

interpretation of the various

relevant provisions of the Code

under Chapter XIV and of the

principles of law enunciated by

this Court in a series of decisions

relating to the exercise of the

extraordinary power under Article

226 or the inherent powers under

Section 482 of the Code which we

have extracted and reproduced

above, we give the following

categories of cases by way of

illustration wherein such power

could be exercised either to

prevent abuse of the process of any

court or otherwise to secure the

ends of justice, though it may not

be possible to lay down any

precise, clearly defined and

sufficiently channelized and

inflexible guidelines or rigid

formulae and to give an exhaustive

list of myriad kinds of cases

wherein such power should be

exercised.

(1) Where the allegations made in

the first information report or the

complaint, even if they are taken

at their face value and accepted in

their entirety do not prime facie

constitute any offence or make out

a case against the accused.

(2) Where the allegation in the

first information report and other

materials, if any, accompanying the

FIR donot disclose a cognizable

offence, justifying an

investigation by police officers

under Section 156(1) of the ode

except under an order of a

Magistrate within the purview of

Section 155(2) of the ode.

(3) Where the uncontroverted

allegations made in the FIR or

complaint and the evidence

collected in support of the same do

not disclose the commission of any

offence and make out a case against

the accused.

(4) Where, the allegations in the

FIR do not constitute a cognizable

offence but constitute only a non-

ongnzable offence, no investigation

is permitted by a magistrate as

contemplated under Section 155(2)

of the Code.

(5) Where the allegations made in

the FIR or complaint are so absurd

and inherently improbable on the

basis of which no prudent person

can ever reach a just conclusion

that there is sufficient ground for

proceeding against the accused.

(6) Where there is an express legal

bar engrafted in any of the

provisions of the Code or the

concerned Act (under which a

criminal proceeding is instituted)

to the institution and continuance

of the proceedings and/or where

there is a specific provision in

the Code or the concerned Act,

providing efficacious redress for

the grievance of the aggrieved

party.

(7) Where a criminal proceeding is

manifestly attended with mala fide

and/or where the proceeding is

maliciously instituted with an

ulterior motive for wreaking

vengeance on the accused and with a

view to spite him due to private an

personal grudge.

We also give a note of caution

to the effect that the power of

quashing a criminal proceeding

should be exercised very sparingly

and with circumspection and that

too in the rarest of rare cases;

that the court will not be

justified in embarking upon an

enquiry as to the reliability or

genuineness or otherwise of the

allegations made in the FIR or the

complaint and that the

extraordinary or inherent powers do

not confer anarbitrary

jurisdiction on the court to act

according to its whim or caprice."

The present case can be brought under more than one head given above without any difficulty.

The above discussion is sufficient to allow this appeal on the facts of this case.

Even though all these facts including the Report of the Central Vigilance Commission were brought to the notice of the High Court, unfortunately, the High Court took a view that the issues raised had to be gone into in the final proceedings and the Report of the Central Vigilance Commission, exonerating the appellant of the same charge in departmental proceedings would not conclude the criminal case against the appellant. We have already held that for the reasons given, on the peculiar facts of this case, the criminal proceedings initiated against the appellant cannot be pursued. Therefore, we do not agree with the view taken by the High Court as stated above. These are the reasons for our order dated 27.3.1996 for allowing the appeal and quashing the impugned criminal proceedings and giving consequential reliefs.

Before parting with the case, we cannot but express our anguish about the way in which the C.B.I. has conducted itself in this case. From the record it is seen that number of adjournments were taken for getting instructions to withdraw the prosecution. After taking a number of adjournments, ultimately the Department decided to leave the matter to the court’s decision.

In this connection, it will be useful to set out a portion from the rejoinder affidavit filed on behalf of the appellant which reads as follows :

"It seems, however, that the

reluctance of the Regional C.B.I.

in dropping the proceedings against

the petitioner/stumps from the fact

that they used to forge the house

valuation report as the sole basis

for charging the petitioner. The

fact that this report is forged is

abundantly clear from the facts and

circumstances set out in the

S.L.P.By this report the house of

the petitioner was sought to be

valued at Rs. 3 lakhs and odd above

the original valuation by the same

Engineer which was accepted by the

Income-tax Department. On this

basis the petitioner’s assets were

shown to be Rs. 3 lakhs and odd and

above as income.

The petitioner has in fact filed a

complaint under Section 340 Cr.P.C.

for taking ognizance against the

officer concerned for using a

forged document in charging the

petitioner. This complaint of the

petitioner is pending before the

Special Judge (CBI) Patna. It is

perhaps on account of the fear of

being found guilty on forgery

document that the Regional C.B.I.

Officers are reluctant to withdraw

the charge against the petitioner.

That is why after having a short

adjournment on 6 occasions from

this Court to enable them to

withdraw the proceedings against

the petitioner, the C.B.I. has

changed its stand and even their

Senior Counsel in his place."

We cannot simply ignore the above extracts from the rejoinder affidavit in the facts and the circumstances of the case. To put it mildly we observe that we are not at all happy about the way in which the C.B.I. has conducted itself in this case. We are sure that the department will not give room for such observations in the future.

Ask CaseMinister about P.S. Rajya v. State of Bihar

Your 24×7 legal assistant on WhatsApp answers with the judgments that apply, in English or Hindi. No signup needed.

Questions about this judgment, or a case like it?Ask on WhatsApp